Project Description

Problem: Request for drilling in the structural specifications to run plumbing conduits in a hotel in Sherbrooke, but no information on conduits or reinforcements present in the concrete slab.

Solution: Detection and complete report of what is found in the concrete with an accuracy of 3mm and using a 1600 GPR.

Result: We discovered/detected an electrical conduit and marked the reinforcement to avoid compromising the load-bearing capacity of the slab. Report accepted and approved by the structural engineer!