Description of the project
An Ottawa excavation contractor needed to excavate 2 metres wide by 100 metres long to a depth of 2 metres to run new conduits.
The problem: He must not damage or break the existing conduits in the ground during his excavation.
The solution: We analyze the ground with the 400Mhz georadar and mark precisely on the surface the various conduits in the ground. Our customer is satisfied because in private areas, we are the reference in detection.